2019 50m Opening Update

27 Sep 2019
By Oliver Barclay
Aquatics, Health & Fitness Health & Fitness, Personal Training

Belgravia Leisure wishes to advise that the 50m outdoor pool repair works are being finalised.  Works are now in place to prepare the pool for patron use, which will involve cleaning, super chlorinating and heating the water.

This work is currently progressing as fast as possible and it is envisaged that the 50m pool will be open for use on 19 October 2019. 

Updates will be made regularly to keep patrons informed, should there be any variation on the above timeframe.  For further queries, please do not hesitate to ask Oliver Barclay Centre Manger or contact Aquatic Centre Management on 02 6331 3333.   

 
 

TripAdvisor Panel

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut quis fermentum dolor, in mollis lacus. Morbi pulvinar sem tortor, aliquet suscipit erat sollicitudin sed. Nulla ultricies convallis ipsum, ac semper sapien sollicitudin non. Vestibulum lobortis turpis purus, sed rutrum dolor mattis in. Aenean dapibus pellentesque nisi in convallis. Nulla a sapien tincidunt, convallis nunc vitae, iaculis lectus. Integer pellentesque venenatis pellentesque. Quisque vel pellentesque diam. In accumsan accumsan risus et porta. Aliquam a quam ut enim facilisis gravida. Aenean finibus metus justo, scelerisque euismod metus semper vitae. Phasellus non risus libero.